OSMOND — Last Thursday, Oct. 15, a large Tesla battery called a Megapack was delivered to the Northeast Power solar farm east of Osmond. The battery, which weighs about 56,000 lbs., is selfcontained and will discharge 2MW over 4 hours. The whole solar farm is 2.5 MW, and Northeast Power is putting in a total of three sites in northeast Nebraska — one by Jackson and one by Martinsburg — for a total of 7.5 MW.
PLEASE LOG IN FOR PREMIUM CONTENT. Our website requires visitors to log in to view the best local news.
Not yet a subscriber? Subscribe today!
